Change Management Template

A template for documenting CAB reviews and rollback criteria for production changes.

Topics: devops

Note: This guide follows English-language naming conventions and terminology standards common in international development teams. Examples use English identifiers and comments to maximize compatibility across codebases and tooling.

Overview

Production changes are risky. A database migration, a configuration update, or a feature flag flip can cascade into an outage. Change management is not bureaucracy—it is a structured way to reduce surprise. This template documents the review, approval, and rollback workflow for any change that touches production, ensuring the right people have reviewed the risk and the rollback path is ready before you start.

When to Use

Use this resource when:

  • Introducing a change to production infrastructure, databases, or configuration
  • Your compliance framework (SOC 2, ISO 27001) requires documented change approval
  • A recent outage was caused by an unreviewed or untested change

Solution

# Change Request: `<Title>`

## 1. Change Summary

| Field | Value |
|-------|-------|
| Change ID | `CHG-YYYY-NNNN` |
| Title | `description` |
| Requester | `@name` |
| Team | `team` |
| Environment | `staging / production` |
| Scheduled Date / Time | `YYYY-MM-DD HH:MM UTC` |
| Duration (expected) | `X minutes / hours` |
| Risk Level | `Low / Medium / High / Critical` |

## 2. Change Description

**What is changing?**
[Describe the technical change in one paragraph.]

**Why is it needed?**
[Link to ticket, incident, or business justification.]

**What are the expected results?**
[Measurable outcome: latency reduced by X%, feature enabled for Y% of users.]

## 3. Impact Analysis

| System / Service | Impact | Validation Method |
|------------------|--------|-------------------|
| | | |

### Dependencies
- [ ] No dependent services affected
- [ ] Dependent services notified: `list`
- [ ] External partners / customers notified: `list`

### Risk Assessment

| Risk | Likelihood | Impact | Mitigation |
|------|------------|--------|------------|
| | | | |

## 4. Rollback Plan

| Condition | Rollback Action | Time to Complete | Owner |
|-----------|----------------|-------------------|-------|
| Change fails during deployment | `git revert` / `terraform destroy -target` / config rollback | 10 min | `@name` |
| Performance degradation > 20% | Rollback to previous image / revert migration | 15 min | `@name` |
| Data inconsistency detected | Restore from pre-change snapshot | 30 min | `@name` |
| Unknown failure mode | Page on-call; execute emergency rollback runbook | 5 min | `@on-call` |

- [ ] Rollback has been tested in staging
- [ ] Rollback command is documented in runbook
- [ ] Database snapshot / backup taken before change
- [ ] Feature flag kill switch is ready (if applicable)

## 5. Approval

| Role | Name | Approved | Date |
|------|------|----------|------|
| Requester | | | |
| Technical Reviewer | | | |
| Product Owner (if user-facing) | | | |
| Security (if data / access change) | | | |
| CAB / Manager (High+ risk) | | | |

## 6. Execution Log

| Time (UTC) | Step | Result | Notes |
|------------|------|--------|-------|
| | | | |

## 7. Post-Change Review

- [ ] Change completed as planned
- [ ] Monitoring shows no anomalies for 1 hour post-change
- [ ] Rollback plan archived / updated based on learnings
- [ ] Ticket closed with outcome summary

Explanation

The template enforces three gates before any production change: a description that justifies the change, an impact analysis that surfaces hidden dependencies, and a rollback plan that is ready before the change starts. The risk level determines who must approve: low-risk changes may only need a peer review, while high-risk changes require a Change Advisory Board (CAB) and explicit sign-off from security. The execution log creates an audit trail that is invaluable during post-mortems and compliance audits.

Variants

ContextApproval GateFocus
Startup / small teamPeer review + team leadSpeed; lightweight documentation
Enterprise / regulatedCAB + security + complianceFull audit trail; formal sign-off
Infrastructure (Terraform)IaC review + plan diffVerify no destructive changes
Database migrationDBA review + rollback scriptData integrity is the priority
Feature flag rolloutProduct + engineeringGradual exposure; instant rollback via flag
Emergency changePost-hoc approval within 24 hoursFix first, document second—but document

Best Practices

  1. Classify risk objectively; if the change touches billing, authentication, or data, it is at least Medium
  2. Never approve your own change; require at least one independent reviewer
  3. Test the rollback in staging, not just the forward change
  4. Schedule high-risk changes during low-traffic windows with full team availability
  5. Keep a change calendar visible to all teams to avoid collision (two risky changes at once)

Common Mistakes

  1. Treating “simple” changes as low-risk without impact analysis
  2. Not notifying downstream teams who depend on the changed service
  3. Skipping rollback testing because “it will probably work”
  4. Approving changes via Slack DM instead of a documented record
  5. Not reviewing the change after execution; lessons are lost if you do not close the loop

Frequently Asked Questions

When does a change need CAB approval?

High and Critical risk changes should go through a Change Advisory Board or equivalent senior review. Criteria include: changes to production databases, modifications to authentication/authorization, infrastructure that affects > 50% of traffic, or changes during a known sensitive period (e.g., Black Friday). Medium risk changes may only need team-lead approval. Low risk changes (e.g., CSS fixes, copy updates) can use peer review.

How do I handle emergency changes that cannot wait for full approval?

Document an emergency change process: the on-call engineer executes the fix, then creates a retroactive change request within 24 hours with the full template filled in. The emergency path should require verbal approval from a manager or team lead, recorded in Slack or a bridge. Do not let “emergency” become an excuse for skipping process every week.

Should infrastructure-as-code changes use this template?

Yes, but integrate with your IaC review process. The change request should reference the pull request and the terraform plan diff. The risk assessment focuses on whether the plan shows destructive changes (resource replacement) or just additive changes. The rollback plan for IaC is often a git revert + re-apply, but verify that the state file will remain consistent.